Price ranges apply to homes in Broward and Palm Beach counties. In Miami-Dade we quote each project individually.
A bathroom is the smallest room most people remodel and, per square foot, the most expensive. Almost every trade works in it: plumbing, electrical, waterproofing, tile, glass, carpentry and paint, all inside a space where two people can barely stand. That is why two bathrooms of the same size can cost very different amounts, and why a price from a neighbor or a national website rarely matches your own.
This guide prices the three bathroom projects homeowners ask about most: a tub-to-shower conversion, a standard full remodel and a primary or master suite. Then it explains the choices that move the price. It is written for homes and condos in South Florida.
The ranges are the prices we work to in Broward and Palm Beach counties. Your own number follows a free in-home visit and comes as a written, fixed-price quote.
The short answer: three projects
Decide which of these sounds like your project and you have a realistic starting range.
Tub-to-shower conversion
The bathtub goes and a shower takes its place. The rest of the bathroom stays as it is.
- Old tub and surround removed
- New shower base with a full waterproofing system
- New wall tile, valve and shower trim
- Door, glass panel or curtain rod
Standard full remodel
The bathroom is worn out, leaks, or still has its original tile and tub.
- Everything removed down to the walls and floor
- New shower or tub with a full waterproofing system
- New wall and floor tile
- New vanity, top, sinks, faucets and toilet
- New shower valve and trim, with plumbing updated where exposed
- New lighting, exhaust fan and protected outlets
- Glass enclosure, permits and inspections
Primary / master suite
A primary bathroom rebuilt around comfort, space and better materials.
- Layout changed: larger shower, relocated toilet or vanity, or a freestanding tub
- Large-format or natural stone tile, often to the ceiling
- Frameless glass, built-in bench and niches
- Custom double vanity with stone top
- Multiple shower fixtures on a dedicated valve system
- Layered lighting and upgraded ventilation
Tub-to-shower conversions and walk-in showers
Taking out a bathtub that nobody uses and building a shower in its place is the bathroom project we are asked about most. As a project on its own, without remodeling the rest of the room, a tub-to-shower conversion typically runs $2,800-$8,000.
The price depends mainly on four things.
- The shower base. A manufactured pan that fits the old tub footprint is the least expensive. A custom tiled base costs more and can be made any size.
- The threshold. A low curb is standard. A curbless, roll-in entry looks clean and is the safest option, but in a slab home the floor has to be cut and re-sloped so water runs to the drain. That is skilled work and adds cost.
- The walls. Tile from the base to the ceiling, the size of the tile, and details such as a niche or an accent band.
- The glass. A curtain rod costs almost nothing. A framed sliding door sits in the middle. Frameless glass, measured and made after the tile is finished, is the premium choice.
One thing that must not be economized is waterproofing. A shower is a box that gets soaked every day in a humid climate. A continuous waterproofing layer behind the tile, tied properly into the drain, is what keeps water out of the wall and out of the unit below you. Tile and grout alone are not waterproof. Ask any contractor exactly which waterproofing system they use and whether the shower is water-tested before tile goes on.
If the shower is for someone who is unsteady on their feet, plan for a bench, a hand-held shower on a slide bar and solid backing in the walls for grab bars, even if the bars themselves go in later. Our aging-in-place guide covers those choices in detail.
What is inside a bathroom remodel price
It helps to see a bathroom quote as separate lines. When two quotes differ, the gap is usually in one or two of them.
- Demolition and disposal, including protecting the path through your home.
- Plumbing: the shower valve, drains, supply lines and fixture connections.
- Waterproofing and tile setting. In a full remodel this is often the largest labor line, and it scales with the amount and size of tile.
- Tile and stone materials.
- Vanity, countertop, sinks and faucets.
- Shower glass.
- Electrical: lighting, fan, protected outlets, and sometimes a new circuit.
- Toilet, mirrors, accessories and paint.
- Permits and inspections.
Fixtures and tile are where homeowner choice has the widest spread. The same bathroom can be finished with good mid-range materials or with materials that cost several times as much, and both can be built to the same standard behind the walls.
See finished rooms and job-site photos in the project gallery, or read about our bathroom remodeling service.
The choices that move the price most
- Moving fixtures. Keeping the toilet, shower and vanity where they are is the biggest saving available. In a slab home, moving a toilet or a shower drain means cutting the concrete floor.
- How much tile. Tiling only the shower and the floor costs far less than tiling every wall to the ceiling.
- Tile size and pattern. Large-format tile and patterns such as herringbone take longer to set and need a flatter wall.
- Shower base. A manufactured pan against a custom tiled base, and a curb against a curbless entry.
- Glass. Framed, semi-frameless or frameless, and how many panels.
- Vanity. A stock vanity with an integrated top is the entry point. A custom double vanity with a stone top is at the other end.
- What is found behind the walls. Old drains, past leaks and earlier unpermitted work are the most common reasons a bathroom costs more than first planned.
What makes a South Florida bathroom different
Humidity and mold. A bathroom here never fully dries out on its own. A properly sized exhaust fan that vents outdoors, not into the attic, matters as much as the tile. Moisture-resistant backing board, mold-resistant materials and a real waterproofing system are the baseline, not upgrades.
Concrete slab floors. The drains run under the slab. That is why relocating a toilet or creating a curbless shower costs more here than in a house with a crawl space, and why keeping fixtures in place is such an effective way to control the budget.
Cast-iron drains. Many homes and buildings from before the mid-1970s have cast-iron drain pipes that corrode from the inside. A bathroom remodel exposes part of that system. If the pipe is failing, replacing the section you can reach while the floor is open is far cheaper than coming back after the new tile is down.
Condominiums. Water is the biggest worry in any condo building, because a leak travels to the neighbors below. Associations commonly ask for the contractor's license and insurance, approval of the plans, limited working hours, a scheduled water shut-off and sometimes specific waterproofing or flooring underlayment. Bathroom work in a high-rise also means carrying every tile and every bag of debris through a service elevator on the building's schedule.
Hard water and salt air. Near the coast, cheap fixture finishes pit and discolor. Good-quality valves and finishes last noticeably longer here.
Permits for bathroom remodels
Work that changes plumbing or electrical generally needs a permit from your city or county building department, and that covers most real bathroom remodels: a new shower valve, a relocated drain, new circuits. Replacing a vanity, a toilet or a faucet in the same spot, or repainting, is generally treated as a repair. The exact line differs between building departments, so ask for the answer for your address in writing.
An inspection of the shower pan and the plumbing before tile is installed is one of the most valuable parts of the process. It is a second set of eyes on the part of the job you will never see again.
Only a licensed contractor can pull these permits on your behalf. You can verify any Florida contractor's license at myfloridalicense.com.
How long a bathroom remodel takes
- Design and selections. Tile, fixtures, vanity and glass. Allow one to three weeks, less if you decide quickly.
- Approvals and permits. From a few days to several weeks, depending on the city and, in a condo, the association.
- Ordering. Vanities, special-order tile and plumbing trim should be on site before demolition starts.
- Construction. Most of our bathroom remodels run about 6 to 10 weeks depending on scope. A refresh or a single upgrade such as grab bars is far quicker. A tub-to-shower conversion on its own is shorter than a full remodel.
Two waits are normal and worth knowing about. Waterproofing and mortar need time to cure before the next step. And frameless glass is measured only after the tile is finished, then fabricated, so there is usually a gap of a week or two when the shower is tiled but has no door. If the home has only one bathroom, tell your contractor at the start so the sequence can be planned around it.
Every step, with what you do and what we do, is on the our process page. Paying over time? See financing.
Where to save, and where not to
- Save by keeping the toilet, shower and vanity in their current positions.
- Save by tiling the wet areas fully and painting the rest of the walls with a moisture-resistant paint.
- Save with a good porcelain tile. It gives the look of stone, needs less maintenance and suits a humid bathroom.
- Save with a quality semi-frameless enclosure instead of heavy frameless glass.
- Do not save on waterproofing. It is invisible when finished and it is the part that decides whether the bathroom lasts.
- Do not save on the shower valve. It sits inside the wall behind the tile, and replacing a cheap one later means breaking finished tile.
- Do not save on ventilation. An undersized or badly vented fan leads to mold, peeling paint and swollen cabinet doors.
- Do not skip the permit or hire an unlicensed installer for work that involves plumbing.
How to compare bathroom quotes
Check that each quote answers the same questions before you compare totals.
- Which waterproofing system is used, and is the shower water-tested before tile?
- How many square feet of tile are included, at what material allowance, and to what height on the walls?
- Which valve and fixtures are included, by brand and model?
- What kind of glass, and is it included in the price?
- Are the vanity, top, mirror, fan and lighting included?
- Are demolition, disposal, permits and inspections included?
- How are hidden problems handled if the old plumbing or the subfloor is damaged?
- What is the payment schedule, and is the contractor licensed and insured?
A low quote that is silent on waterproofing or that leaves the glass out is not really a low quote.
How we price a bathroom at Genesis Home Design
We visit the home at no charge, measure the room, check the plumbing we can see and the access for materials, and ask who will use the bathroom and how. If you are in a condo we ask for the association's contractor rules up front. You then get a written, fixed-price quote with the work in clear lines, so you can see the effect of each choice before anything is ordered.
Genesis Home Design LLC is a Florida Certified General Contractor, license #CGC1542493, and carries general liability insurance. Plumbing and electrical work inside your remodel is done by licensed trade partners under our permit. We serve Broward, Miami-Dade and Palm Beach counties from our office in Hallandale Beach.
Frequently asked questions
How much does a bathroom remodel cost in South Florida?
In Broward and Palm Beach counties, a standard full bathroom remodel runs $7,200-$22,400, with most projects at $9,600-$16,000. A primary or master suite runs $12,000-$40,000, and a tub-to-shower conversion on its own runs $2,800-$8,000. Layout changes, the amount of tile and the fixtures you choose decide where you land.
How much does a tub-to-shower conversion cost?
On its own, without remodeling the rest of the bathroom, a tub-to-shower conversion typically runs $2,800-$8,000. A manufactured base and a framed door are at the lower end. A custom tiled, curbless shower with frameless glass is at the upper end.
Do I need a permit to remodel a bathroom in Florida?
Generally yes when plumbing or electrical is changed, which covers most real remodels. Like-for-like swaps of a vanity, toilet or faucet and painting are generally treated as repairs. Your city or county building department decides, and a licensed contractor pulls the permit.
How long does a bathroom remodel take?
Most of our bathroom remodels run about 6 to 10 weeks depending on scope. A single upgrade is far quicker. Allow extra time for condo approval, permits and made-to-measure glass.
Can you replace my bathtub with a walk-in shower?
Yes. It is one of the most common projects we are asked about. We can use the existing drain location in most cases, and we can build a low-curb or a curbless entry depending on the floor and your needs.
Will a bathroom remodel in my condo affect my neighbors?
It should not, if it is planned properly. We follow the building's rules on working hours, protect common areas, schedule water shut-offs with management and use a full waterproofing system so water stays in your shower.
Is the consultation free?
Yes. The in-home visit and the written, fixed-price quote are free and carry no obligation.
Next steps
- Try the remodel cost calculator for an instant ballpark, no email needed.
- Read about our bathroom remodeling service.
- See real work in the project gallery.
- Related guide: How Much Does a Kitchen Remodel Cost in South Florida?
- Related guide: How Much Does Aging-in-Place Remodeling Cost in South Florida?
Price ranges are planning figures and are not a quote. Price ranges apply to homes in Broward and Palm Beach counties. In Miami-Dade we quote each project individually.Every home is different: your price comes from a free in-home visit and a written, fixed-price quote.