How Much Does a Kitchen Remodel Cost in South Florida?

Three price tiers, the choices that move the number, and what is different about remodeling a kitchen in Broward, Miami-Dade and Palm Beach.

Licensed & InsuredFL Lic. #CGC1542493Free In-Home Consultation
Licensed & InsuredFL Lic. #CGC1542493Many Years of ExperienceWorkmanship WarrantyFree In-Home Design Consultation<5 Min Response in Business HoursFlexible financing available. Ask us

By Genesis Home Design · Florida Certified General Contractor #CGC1542493 · Updated 2026-11-21

Price ranges apply to homes in Broward and Palm Beach counties. In Miami-Dade we quote each project individually.

Ask three contractors what a kitchen remodel costs and you will get three numbers that are not talking about the same kitchen. One is pricing new doors and a countertop. Another is pricing a full gut with the sink moved to an island. The honest answer is a range, and the range only becomes useful once you know which kind of project you are describing.

This guide sorts kitchen remodels into three tiers, explains what each one includes, and then walks through the decisions that push the price up or down. It is written for homes and condos in Broward, Miami-Dade and Palm Beach counties, because a kitchen here is built differently from one in most of the country, and those differences show up in the price.

The ranges below are the prices we work to in Broward and Palm Beach counties. Your number will depend on your room, your building and your choices, which is why every project we take on starts with a free in-home visit and ends with a written, fixed-price quote.

The short answer: three tiers

Most kitchen projects fall into one of three groups. Find the description that sounds like yours and you have a realistic starting range.

Small or partial refresh

$6,400-$16,000

The layout works and the cabinets are sound, but the kitchen looks dated.

  • Cabinets kept in place and refaced or repainted, with new hardware
  • New countertops and a new sink and faucet in the same location
  • New backsplash tile
  • Updated lighting on existing wiring
  • Fresh paint

Midrange full remodel

$11,200-$36,000

The kitchen is worn out or the layout no longer works for the household.

  • Everything removed down to the walls
  • New cabinets throughout, often with a new layout
  • Quartz or stone countertops
  • New flooring, backsplash, sink and faucet
  • Electrical brought up to current code, with recessed and under-cabinet lighting
  • New appliances fitted to the new layout
  • Permits and inspections

High-end / luxury kitchen

$30,400-$64,000+

A custom kitchen where design and materials come first.

  • Custom cabinetry built for the room, often to the ceiling
  • Walls opened or removed to change the shape of the space
  • Sink, range or island moved, with new plumbing, gas or venting
  • Premium stone, full-height backsplash or waterfall island
  • Panel-ready or professional-style appliances
  • Layered lighting plan and custom details

Get an instant ballpark with the calculator →

What is actually inside a kitchen remodel price

A kitchen quote is a bundle of very different costs, and it helps to see them separately. When two quotes are far apart, the gap is almost always in one or two of these lines, not spread evenly across all of them.

  • Cabinets. Usually the largest single line. The price depends on how many boxes the room needs, how they are built, and whether they are stock sizes, semi-custom or built to order.
  • Countertops. Priced by the square foot of material plus fabrication: cut-outs for the sink and cooktop, edge profile, and the number of seams.
  • Labor and trades. Demolition, carpentry, plumbing, electrical, drywall, tile and paint. In a full remodel this is a large share of the total, and it is the part that varies most with the condition of the house.
  • Appliances. Sometimes bought by the homeowner, sometimes included. Make sure every quote you compare treats them the same way.
  • Flooring, backsplash, sink, faucet and lighting. Each is modest alone, but together they add up.
  • Permits, plans, protection of the rest of the home, and disposal of the old kitchen.

Ask any contractor to show you these lines. A single lump-sum number with no breakdown makes it impossible to see what you are paying for, or to trim the project sensibly if the total is over your budget.

The seven choices that move the price most

These are the decisions that separate a modest kitchen budget from a large one. None of them is right or wrong. Each is a trade between cost and what you get.

  • Keeping or changing the layout. Leaving the sink, range and refrigerator where they are is the single biggest saving available. Moving them means new plumbing, new electrical circuits and sometimes new venting.
  • Cabinet construction. Stock cabinets come in fixed sizes and are the least expensive. Semi-custom lines allow changes in size and finish. Fully custom cabinets are built for the room and cost the most, but they use every inch.
  • Countertop material. Laminate is the entry point. Quartz and granite sit in the middle and suit most kitchens. Rare stone, thick slabs and waterfall edges are at the top.
  • Removing a wall. Opening the kitchen to the living area changes the whole home, but a wall may carry structure, wiring, plumbing or air ducts. It needs an engineer's input and a permit if it is load-bearing.
  • Electrical. Older kitchens rarely have enough circuits for a modern set of appliances. Adding circuits, and sometimes upgrading the panel, is common in a full remodel.
  • Appliances. A standard appliance package and a professional-style package can differ by more than the cost of all the cabinets.
  • Flooring. Tiling only the kitchen is simple. Matching or replacing flooring that runs through the whole main living area is a much larger job.

See finished rooms and job-site photos in the project gallery, or read about our kitchen remodeling service.

What makes a South Florida kitchen different

Most cost guides are written for the whole country. Several things about homes here change the work, and you should expect a careful contractor to raise them before giving you a number.

Concrete slab floors. Most South Florida homes sit on a concrete slab with the drain lines running underneath it. Moving a sink to an island therefore means cutting a trench in the concrete, laying new pipe, having it inspected and pouring the floor back. It is routine work, but it is a real cost, and it is the main reason that changing a kitchen layout costs more here than in a house with a crawl space under the floor.

Concrete block walls. Exterior walls are usually concrete block. Running a new vent or wire through block takes more time than through a wood-framed wall, which matters if your range is moving to an outside wall.

Condominiums. A large share of kitchens in this region are in condo buildings. The association normally wants to approve the plans, see the contractor's license and insurance, and set the hours when work and deliveries are allowed. Many buildings require a sound-control underlayment beneath hard flooring, a booked service elevator, and advance notice before the water to a stack of units is shut off. None of this is difficult, but it adds planning time, and working around restricted hours makes each day on site shorter.

Older plumbing and wiring. Many homes built before the mid-1970s have cast-iron drain pipes, which corrode from the inside in this climate. Some homes from later decades have supply piping or wiring that insurers and inspectors no longer like to see. A remodel is when these things are exposed, and it is far cheaper to deal with them while the walls are open than after the new kitchen is in.

Humidity. Moisture is constant here. Cabinet boxes, finishes and adhesives should be chosen for it, the range hood should vent properly, and a home that sits closed up for part of the year needs materials that tolerate that.

Storm season. From June through November a storm threat can pause deliveries, inspections and work for several days. A sensible schedule allows for it instead of promising a date that depends on perfect weather.

Permits: when a kitchen remodel needs one

Florida's building code is statewide, but permits are issued by your city, or by the county if you live in an unincorporated area. As a rule of thumb, work that changes plumbing, electrical, gas, air-conditioning ducts or structure needs a permit. Purely cosmetic work such as painting, replacing cabinet doors or swapping a faucet in the same place generally does not. Each building department draws the line a little differently, so the answer for your address should come from your contractor in writing.

Permitted work is inspected. That protects you: an inspector who does not work for the contractor checks the plumbing and electrical before the walls are closed. It also matters later. Unpermitted work can surface during a sale or an insurance claim, and fixing it then is expensive.

In Florida a contractor must hold a state license to pull these permits. Be careful with anyone who asks you to pull an owner-builder permit for work they will do: that makes you legally responsible for the job. You can check any license, including ours, on the Florida DBPR website at myfloridalicense.com.

How long a kitchen remodel takes

Homeowners usually ask about construction time, but the calendar starts earlier than demolition. A realistic plan has four stages.

  • Design and selections. Measuring, layout, and choosing cabinets, countertops, tile, fixtures and appliances. Allow a few weeks. Decisions made here are far cheaper than decisions changed later.
  • Approvals and permits. Condo association review and the building department run on their own timetables, from days to several weeks depending on the building and the city.
  • Ordering. Cabinets are made to order and commonly take several weeks to arrive. A good contractor does not demolish your kitchen until the cabinets have a confirmed delivery date.
  • Construction. Most of our kitchen remodels run about 6 to 10 weeks on site, depending on scope. A refresh is shorter. A remodel that moves plumbing in the slab or removes a wall is at the longer end.

One step surprises people: stone countertops are measured only after the new cabinets are installed, then cut and delivered. That gap is normal. Plan for a stretch with cabinets in place and no sink.

Every step, with what you do and what we do, is on the our process page. Paying over time? See financing.

Where to save, and where not to

If the first number is above your budget, cut in the right places.

  • Save by keeping the layout. Leaving plumbing and appliances where they are is worth more than any discount on materials.
  • Save on cabinet construction, not cabinet quantity. A well-made semi-custom line in a simple door style looks excellent and costs far less than custom work.
  • Save on the countertop by choosing a common quartz color in a standard thickness.
  • Save by keeping sound appliances and designing the new cabinets to fit them, or to fit their eventual replacements.
  • Do not save on what is behind the walls. Corroded drains, undersized wiring and missing shut-off valves should be fixed while everything is open.
  • Do not save by skipping the permit. It is the cheapest protection in the whole project.
  • Do not save by choosing an unlicensed or uninsured contractor. If something goes wrong on an unlicensed job, you have very little recourse.

How to compare kitchen quotes

Two quotes can only be compared if they describe the same job. Before you look at the totals, check that each one states the same things.

  • The cabinet line and construction, door style and finish, and a drawing with the cabinet count.
  • The countertop material, thickness and edge, and who supplies the sink and faucet.
  • Whether appliances, flooring, backsplash tile and paint are included.
  • Whether permits, plans, demolition and disposal are included.
  • What happens if hidden damage is found, and how changes are priced and approved.
  • The payment schedule. Payments should follow progress on the job. Florida law also sets deadlines for a contractor who takes more than 10 percent of the price up front to apply for permits and to start work.
  • The license number and proof of insurance.

The lowest total is often the one that left something out. A quote that is clear about what is and is not included is worth more than one that is a little cheaper and vague.

How we price a kitchen at Genesis Home Design

We do not quote kitchens over the phone, because the number would be a guess. We come to your home at no charge, measure the room, look at the plumbing, the electrical panel and the building rules if you are in a condo, and talk through how you use the kitchen. Then we give you a written, fixed-price quote with the work broken into clear lines, so you can see where the money goes and adjust the plan before anything is ordered.

Genesis Home Design LLC is a Florida Certified General Contractor, license #CGC1542493, and carries general liability insurance. Plumbing and electrical work inside your remodel is done by licensed trade partners under our permit. We work across Broward, Miami-Dade and Palm Beach counties from our office in Hallandale Beach.

Frequently asked questions

How much does a kitchen remodel cost in South Florida?

It depends on the tier. In Broward and Palm Beach counties, a small or partial refresh that keeps the cabinets and layout runs $6,400-$16,000, a midrange full remodel with new cabinets and countertops runs $11,200-$36,000, and a high-end or luxury kitchen runs $30,400-$64,000+. The size of the room, the layout changes and the materials you choose decide where you land.

What is the most expensive part of a kitchen remodel?

Cabinets are usually the largest single cost, followed by labor and trades, then countertops and appliances. Moving the sink, range or island is the choice that adds the most, because in a South Florida home it usually means cutting the concrete slab to run new drain lines.

Do I need a permit to remodel my kitchen in Florida?

You need one when the work changes plumbing, electrical, gas, ductwork or structure. Cosmetic work such as painting or replacing cabinet doors generally does not. Permits are issued by your city or county building department, and a licensed contractor pulls them for you.

How long does a kitchen remodel take?

Most of our kitchen remodels take about 6 to 10 weeks of construction, depending on scope. Before that, allow time for design, condo or permit approvals, and cabinet delivery, which commonly takes several weeks.

Can I remodel a kitchen in a condo?

Yes. The association will normally review the plans, ask for the contractor's license and insurance, and set working hours, elevator bookings and flooring rules. We prepare those documents and build the approval time into the schedule.

Can I stay in my home during the remodel?

Most people do. Expect to be without a working kitchen for the construction period, so set up a temporary spot with a microwave, a coffee maker and the refrigerator. We protect floors and seal off the work area to keep dust out of the rest of the home.

Is the consultation really free?

Yes. The in-home visit and the written, fixed-price quote cost nothing and carry no obligation.

Next steps

Price ranges are planning figures and are not a quote. Price ranges apply to homes in Broward and Palm Beach counties. In Miami-Dade we quote each project individually.Every home is different: your price comes from a free in-home visit and a written, fixed-price quote.

Not ready for a quote yet?

Get The South Florida Remodel Planning Guide: our price ranges on one page, ten questions to ask any contractor, permit and condo notes, and a realistic timeline. Free PDF.

We only contact you about your project. We never sell your information.

Step 1 of 3

Get Your Free Quote · No obligation

What are you remodeling?

Or call (754) 714-5024

Licensed & Insured · FL Lic. #CGC1542493

What happens next
  1. We call you within minutes (business hours)
  2. Free In-Home Design Consultation & measure
  3. Written fixed-price quote
  4. We build, permits handled

Flexible financing available. Ask us

“I recently hired them to remodel my home and I couldn't be happier with the results.” Mathew Clark

“We were so impressed with the work done by these guys.” Lars & Mary Williams

“Look no further for exceptional work!” Chris Parks

Call NowFree Quote