Our Process: From First Call to Final Walkthrough
Six steps, what we do in each one, what you do, and how long it realistically takes.
The short version, in 34 seconds
Press play for a quick look at how a remodel with us runs: free consultation, in-home visit and design, a written fixed-price quote, then the build and a final walkthrough.
The video groups the work into four stages. The six steps below give the detail: what we do in each one, what you do, and how long it realistically takes.
Free consultation
What we do. We call you back within minutes during business hours, ask what you have in mind and book a visit.
What you do. Tell us which room, roughly what you want to change, and when you hope to start. Photos help.
How long. A phone call of about ten minutes.
In-home visit and design
What we do. We measure the room, look at the plumbing, the electrical panel and access, and plan the layout and finishes with you. In a condo we ask for the association's contractor rules at this point.
What you do. Show us how you use the space and what bothers you about it. If you have saved pictures of rooms you like, have them ready.
How long. About an hour at your home. Choosing cabinets, tile and fixtures usually takes one to three weeks, depending on how quickly you decide.
Written fixed-price quote
What we do. You get a written quote with the work broken into clear lines, so you can see what each part costs and adjust the plan before anything is ordered.
What you do. Read it, ask questions, change what you want changed. Ask about financing here if you would like it.
How long. There is no deadline on your side and no obligation.
Permits and ordering
What we do. We prepare and file the permit application, handle any condo or HOA approval paperwork, and order the cabinets and other made-to-order items.
What you do. Sign the approval forms your association asks for, and confirm your final selections.
How long. From a few days to several weeks, depending on your city and building. Cabinets commonly take several weeks to arrive. We do not demolish anything until the long-lead items have a delivery date.
Build
What we do. One licensed team does the work: demolition, plumbing and electrical by licensed trade partners, inspections, then cabinets, tile, counters and finishes. We protect floors and seal off the work area.
What you do. Clear the room before day one, and set up a temporary kitchen or plan around the bathroom being out of use. We keep you informed as each stage finishes.
How long. Most kitchen and bathroom remodels run about 6 to 10 weeks on site, depending on scope. A single upgrade such as grab bars is done in a day or two.
Final walkthrough
What we do. We walk the finished job with you, note anything that needs adjusting and take care of it. The permit is closed out with the final inspection.
What you do. Look at everything, open every door and drawer, run every tap. Tell us anything that is not right.
How long. About an hour, at the end of the build.
Want the detail for your kind of project?
- Kitchen remodeling and the kitchen cost guide
- Bathroom remodeling and the bathroom cost guide
- Aging-in-place remodeling and the aging-in-place cost guide
- Job-site photos of work under way are in the project gallery.
Get Your Free Quote · No obligation
What are you remodeling?
Or call (754) 714-5024Licensed & Insured · FL Lic. #CGC1542493
- We call you within minutes (business hours)
- Free In-Home Design Consultation & measure
- Written fixed-price quote
- We build, permits handled
“I recently hired them to remodel my home and I couldn't be happier with the results.” Mathew Clark
“We were so impressed with the work done by these guys.” Lars & Mary Williams
“Look no further for exceptional work!” Chris Parks