Accessible Bathroom Remodeling in South Florida

Genesis Home Design LLC is a Florida Certified General Contractor, Lic. #CGC1542493, based in Hallandale Beach, FL, serving Broward, Miami-Dade and Palm Beach counties.

Bathroom after a tub-to-shower conversion: tiled walk-in shower with sliding glass doors

Licensed & Insured: Florida Certified General Contractor (Lic. #CGC1542493) Free in-home design consultation We call within minutes during business hours Written workmanship warranty

Start here

Free In-Home Design Consultation

Step 1 of 3

Free In-Home Design Consultation · No obligation

What are you remodeling?

Or call (754) 714-5024

Licensed & Insured · FL Lic. #CGC1542493

What happens next
  1. We call you within minutes (business hours)
  2. Free In-Home Design Consultation & measure
  3. Written fixed-price quote
  4. We build, permits handled

An accessible bathroom is a bathroom rebuilt so a person can use it safely and on their own as strength, balance or mobility change: a shower you can enter without stepping over a wall, a toilet you can sit on and rise from with support, a sink you can reach from a chair, and enough clear floor to turn around. It is a whole-room remodel, not a single fixture swap. The shower, toilet, sink, door, floor and lighting all have to work together, because a room with an accessible shower and a door too narrow to enter is not accessible at all. This guide walks through what the job is, the phases in order, the permit and condo rules, the accessibility dimensions that matter, the waterproofing and drainage, the cost ranges, and what delays the job. It is general information, not legal advice. If a question involves your contract or your rights, talk with a Florida attorney before you sign.

1. What it is and who it suits

An accessible bathroom remodel rebuilds the room around four fixtures and the space between them: the shower, the toilet, the sink and vanity, and the door. The work typically includes a walk-in or roll-in shower with no curb or a very low threshold, grab bars at the shower and toilet, a toilet at a height that makes sitting and standing easier, a sink with knee space underneath, lever or sensor faucets, a wider door, and slip-resistant flooring. A walk-in tub is an option some households choose instead of a shower; it keeps a soaking bath with a door in the side of the tub. Which one suits a household depends on whether the person bathes or showers, and on what the room can fit.

It suits a household planning to age in place, a person whose balance or strength has changed, anyone who uses a walker, a shower chair or a wheelchair now or expects to, and anyone recovering from surgery or an injury who needs support in the room for a while. The U.S. Department of Veterans Affairs notes that about half of all falls happen at home, and the bathroom is where the most serious falls happen, because it combines hard, wet surfaces with sitting down and standing up. The National Institute on Aging advises replacing a tub with a walk-in or curbless shower if stepping over the tub wall is no longer safe.

The tub-to-shower conversion itself is covered in our separate guide to tub-to-shower conversion, which gives the conversion in full detail: the Code minimums, the flood test, the shower types and the permit position. This guide does not repeat that detail. It covers the whole bathroom around the shower, and it points to the conversion guide where the shower itself is the question.

Think twice before removing the only bathtub in the house if small children bathe in it, or before shrinking the room to fit a larger shower if the toilet or sink clearances in section 4 cannot then be met. An accessible bathroom is a layout problem first: every fixture needs its clear floor space, and the clearances can overlap each other, but the door still has to swing clear and the room still has to turn a chair around.

2. The remodel in order

A full accessible bathroom remodel runs in the same order every time, and the order is not a preference. The building official has to see the pipes, the wiring and the waterproofing before anything covers them. Glass cannot be measured until the tile is set, because the opening is not final until the tile is in.

Design and selections. Goals, measurements, layout, materials and fixtures are decided here. The layout is the hard part: the turning space, the clear floor at each fixture, the door swing and the shower entry all have to fit in the same room. Section 4 gives the dimensions to plan around. This is also when the shower type, the toilet height, the sink and vanity, the grab bar positions and the blocking behind them, the door width, the flooring and the lighting are decided. Blocking for grab bars goes in the walls now, while they are open, even for bars you plan to fit later.

Permits. The permit application goes to the city, or the county for an unincorporated address, with the plans and trade details. No plumbing or electrical work may start before the permit is issued. Section 3 gives the permit rules.

Demolition. The old fixtures, tub and wall surfaces come out, usually to the studs. Demolition is usually the fastest phase. What it uncovers can change the schedule: hidden damage, old plumbing that does not meet the current Code, or a wall that turns out to be load-bearing. None of that can be priced or timed until the walls are open, which is why a schedule made before demolition is an estimate, not a promise.

Rough-in. The drain moves to the new shower position, and new supply lines, valves and fixtures go in. Any electrical work, such as a moved outlet, a light or a heated floor, goes in here too, as does any framing change for a wider door opening, a seat or a walk-in tub. In a home built on a concrete slab, moving the drain usually means opening the floor. Rough-in must be inspected before the walls are closed. See section 3.

Waterproofing and the flood test. The liner and waterproofing go in, and the lined shower pan is filled with water and checked for leaks before any tile covers it. Section 5 gives the details.

Finishes. Tile, fixtures, glass, vanity and paint go in, in that order. Tile goes on after the waterproofing passes, on a backer approved for wet areas. Fixtures and grab bars go in last.

Final inspection and walkthrough. The final inspections are made after the building is complete and ready for occupancy. The walkthrough is where the homeowner and the contractor go through the finished bathroom together and list anything still to fix, the punch list. The job is done when the punch list is done and the final inspection has passed.

How long it takes. No official source states how long an accessible bathroom remodel takes on its own. The closest published guide is the National Kitchen and Bath Association rule of thumb for the complete rebuild of a master bath (120 square feet): four months to plan and two months to execute. An accessible remodel is about that size of job, but its calendar still depends on the permit review, material delivery and inspection scheduling. Do not take any figure in this guide as a promise for your home. The written quote for your job is the only schedule that applies to it.

3. Permits and inspections

An accessible bathroom remodel needs a permit. It moves plumbing fixtures and drains, changes electrical work and often changes the door opening or the framing, so it is plumbing, electrical and sometimes structural work, and that work needs a permit.

The HB 803 small-job exemption does not help. It applies only if all six of its conditions are true, including that the work involves no electrical, plumbing, structural, mechanical or gas work at all. An accessible remodel always involves plumbing work, so it cannot qualify. The full six conditions are in our permit guide.

The position by city and county, verified on official pages and carried over from our permit guide:

  • Aventura expressly names kitchen remodel and bathroom remodel as permit work.
  • Fort Lauderdale: a remodel touching plumbing, electrical, mechanical, gas or structure still requires a permit regardless of cost.
  • Palm Beach County (unincorporated): replacing a bathtub or shower needs a permit even like-for-like, and HB 803 does not apply in Palm Beach County at all, because the whole county is designated a flood hazard area.
  • Miami-Dade County: a permit is needed for interior renovations that alter or repair electrical or plumbing. Like-for-like fixture replacement is exempt only where no valves, pipes or fixtures are replaced or rearranged, and a remodel replaces and rearranges them.

State deadlines. Florida law sets deadlines for permit decisions in s. 553.792, Florida Statutes. After receiving a complete and sufficient application, the local government must approve, approve with conditions, or deny the permit within:

  • 5 business days, for a complete application on an existing single-family home where the work is valued under $15,000.
  • 30 business days, for a residential unit, including a single-family home, in a structure under 7,500 square feet.
  • 60 business days, for a residential unit in a structure of 7,500 square feet or more, and for multifamily residential buildings up to 50 units.

These deadlines run from a complete application. The city must tell the applicant in writing within 5 business days what is needed to deem the application complete, or the application is automatically deemed complete and accepted. If the city asks for revisions, the applicant has 10 business days to submit them, and the city then has 10 business days to approve or deny. If the city misses a deadline, it must reduce the permit fee by 10 percent for each business day it is late, or 20 percent per business day if it misses the 10-day re-review deadline. A local ordinance may set a shorter deadline than the statute.

One city figure. The City of Fort Lauderdale states on its Permitting Services page that it generally attempts to review permit applications within 30 working days, and that its Development Services Department is committed to complete all initial permit reviews within 30 days or less of receipt. That matches the 30-business-day state deadline for a single-family home under 7,500 square feet.

No published review time was found for the other cities we serve. Hallandale Beach, Hollywood, Aventura, Boca Raton, Pembroke Pines, Miami-Dade County, Broward County and Palm Beach County publish their permit processes, but no published review time for a kitchen or bathroom remodel was found on their official pages. Third-party estimates for those cities exist and conflict with each other, so they are not used here. Confirm the current review time with the building department for your address before planning around a date.

Permit expiry. A permit for a single-family home now expires 1 year after issuance, or on the effective date of the next edition of the Florida Building Code, whichever is later. An extension is still possible. A permit that expires before the work is done must be renewed, which adds time, so the construction schedule should fit inside the permit's life.

Inspections. The Florida Building Code, Chapter 1, s. 110.3, lists the required inspections, and the building official determines their timing and sequence. For a bathroom remodel, the plumbing rough-in inspection comes after the framing is in place and all soil, waste and vent piping is complete, and before the wall or ceiling membranes are installed. An electrical rough-in inspection follows the same rule if the job moves or adds any electrical work. Final inspections for each trade come after the building is complete, all fixtures are in place and properly connected, and the structure is ready for occupancy.

Two rules in the Code shape the schedule. First, the rough-in inspections happen before the walls are closed, so drywall, tile and finishes wait on them. Second, work must not be covered before the required inspection is completed and approved. Covering work early can require removing it at the owner's expense for re-inspection. A failed inspection means correcting the work and calling for a re-inspection, which adds days. No published figure was found for how long an inspection takes to schedule once requested in any of the cities we serve. The lined shower pan is also tested and inspected before tile covers it, as described in section 5.

4. Accessibility and safety

A note on measurements. The 2010 ADA Standards for Accessible Design set rules for places of public accommodation and government facilities, not for a private home. The measurements in this section come from those Standards, as explained in the U.S. Access Board's guides to bathing rooms and toilet rooms, and are used here as a reference for sizing a shower, toilet, sink, grab bars, door and turning space. They are not legal requirements for your home. Where no official source states a figure, this guide describes the check without inventing a number.

Layout and clear floor space. The room needs turning space: a 60 inch diameter circle, or a T-shaped space, so a person using a wheelchair can turn around. The turning space can overlap fixture clearances, and the door can swing into it. Each fixture needs its own clear floor space: at least 30 inches by 48 inches at the lavatory and at each control or operable part, and the water closet clearance in the toilet paragraph below. Fixture clearances can overlap each other, which is how a small bathroom fits at all, but the door cannot swing into a fixture clearance, except in a single-user room where unobstructed space is provided beyond the arc of the door swing. The walking surface into and through the room is at least 36 inches wide.

The door. A door opening must provide a clear width of at least 32 inches, measured between the face of the door and the stop with the door open 90 degrees. In practice that usually means a wider door slab than the one in an older bathroom, and sometimes a wider rough opening. The door also needs maneuvering clearance: on the push side the clearance is 48 inches deep, on the pull side 60 inches deep, with at least 12 inches on the latch side for a push-side door with a closer and latch, and at least 18 inches for a pull-side door. No fixture or element may overlap the door maneuvering clearance. If the door swings in and the room is small, consider a door that swings out, a pocket door, or a barn-style door, and confirm with the building department that the choice meets the Code for the home.

The shower. The shower is covered in full in our tub-to-shower conversion guide. In brief, the Access Board guide describes three shower types, and the figures are reference dimensions for a home, not Code requirements. A transfer shower is 36 by 36 inches clear inside, that figure is exact, not a minimum, with an entry at least 36 inches wide, a clear floor space in front 36 inches wide by 48 inches long minimum, and a seat. A standard roll-in shower is at least 30 inches deep by 60 inches wide, with the entry running the full 60 inch width and a clearance 30 by 60 inches. An alternate roll-in shower is 36 inches wide by 60 inches deep minimum, with an entry at least 36 inches wide at one end. The threshold is 1/2 inch maximum if beveled. A curbless shower removes the step entirely: the floor slopes to the drain and there is no curb to step over. The shower floor slope is 1:48 maximum. The controls sit above the grab bars, no higher than 48 inches, and at least 1 1/2 inches above the grab bar. For a transfer shower the controls sit on the side wall, 38 to 48 inches above the floor, and 15 inches maximum from the seat centerline. The shower needs a hand-held spray unit that can also be used in a fixed position, with a hose at least 59 inches long, and the water temperature is limited to 120 degrees F. Set the water heater to 120 degrees F to avoid scalding tap water.

The toilet. The toilet centerline is 16 to 18 inches from the side wall. The clearance is 60 inches wide minimum by 56 inches deep minimum, which is the space for approach and transfer. The seat height is 17 to 19 inches, measured to the top of the seat. Flush controls must be on the open side. Grab bars go on the wall beside and behind the toilet: the rear bar is 36 inches long minimum, extending 12 inches minimum on one side of the toilet centerline and 24 inches on the other, and the side bar is 42 inches long minimum, starting no more than 12 inches from the rear wall and extending at least 54 inches in front of the toilet. Both bars sit 33 to 36 inches above the finished floor, measured to the top of the gripping surface. The toilet paper dispenser outlet sits 15 to 48 inches above the floor, with its centerline 7 to 9 inches beyond the leading edge of the toilet. A raised toilet seat or a taller toilet gets the seat into the 17 to 19 inch range; a standard toilet is lower, and the difference matters most when standing up again.

The sink and vanity. The front of the rim or counter surface is no more than 34 inches above the finished floor. The clear floor space in front is at least 30 inches by 48 inches for a forward approach. Under the sink there must be knee space: at least 27 inches high, at least 30 inches wide, at least 11 inches deep at 9 inches above the floor and at least 8 inches deep at 27 inches above the floor, with toe space at least 9 inches high and at least 17 inches deep under the sink. That means a wall-hung sink or a vanity with the cabinet removed, not a full cabinet under the basin. Water supply and drain pipes under the sink must be insulated or otherwise configured to protect against contact, and there must be no sharp or abrasive surfaces underneath. Faucets must be operable with one hand, with no tight grasping, pinching or twisting, and with no more than 5 pounds of force; lever handles and sensor faucets meet this, round knobs that must be gripped and twisted do not. A hand-operated metering faucet must stay open at least 10 seconds. In a private home, cabinetry may be kept under the sink if it can be removed without removing the fixture, the finish floor extends under it, and the walls behind it are finished, so the knee space can be opened later. The mirror above the sink has its bottom edge no more than 40 inches above the finished floor; a mirror not above a sink or counter has its bottom edge no more than 35 inches above the floor.

Grab bars. The top of the gripping surface is 33 to 36 inches above the finished floor. A round bar is 1 1/4 to 2 inches in diameter, sits 1 1/2 inches from the wall, and holds 250 pounds applied at any point. Nothing may project within 12 inches above a grab bar, or within 1 1/2 inches of its bottom and ends. In a private home, grab bars are not required if the walls are properly reinforced for later installation. The practical takeaway is to put solid blocking in the walls during the remodel, at the shower and at the toilet, so grab bars can be fitted later without opening the wall. Suction-cup bars are not a substitute: they are not fixed to the wall and cannot be relied on to hold a person's weight.

Fixtures and controls. Every control a person must reach and work, light switches, faucets, shower controls, the toilet flush, must be operable with one hand, with no tight grasping, pinching or twisting, and with no more than 5 pounds of force. The reach range is 15 inches minimum to 48 inches maximum above the floor. Shelves sit 40 to 48 inches above the floor. Put the light switches, the fan control and the outlet where they can be reached from a chair, and put a night light on the path to the toilet.

Flooring and lighting. Put nonskid strips or mats on the shower floor and on the bathroom floor where it may get wet. Choose a floor tile with a slip-resistant surface and keep the grout lines tight so a walker or chair rolls evenly. The bathroom floor outside the shower should slope gently to a drain if one is provided, and never pool water where a person stands. Light the room brightly and evenly, with no glare at the mirror, and light the shower itself: a dark shower is a fall risk even with grab bars. A small night light left on overnight covers the trip to the toilet.

5. Waterproofing and drainage

The shower is the wettest place in the house, and the waterproofing is hidden behind tile. It is the part of the job that matters most and is hardest to fix later. The full shower waterproofing detail is in our tub-to-shower conversion guide. In brief: a shower compartment must have at least 900 square inches of interior floor area and at least 30 inches in its smallest dimension, with a clear entry at least 22 inches wide, and hinged shower doors open outward. Bathtub and shower walls must be finished with a non-absorbent surface extending at least 6 feet above the floor, with water-tight joints. The curb is 2 to 9 inches deep measured from the top of the curb to the top of the drain, and it must sit at least 1 inch below the sides and back of the receptor; for a curbless shower there is no curb and the floor slopes to the drain. The finished shower floor slopes uniformly toward the drain at 2 to 4 percent. The drain is flanged, with a clamping ring and weep holes, and sits at the low point of the floor. For a site-built shower floor, the lining is pitched 2 percent toward the drain, turns up at least 2 inches above the finished threshold, and is not nailed or perforated at any point less than 1 inch above the finished threshold.

Flood test. Before any tile or mortar covers the liner, the drain is plugged watertight and the lined area is filled with water to at least 2 inches at the threshold. The model code requires the water to be held at least 15 minutes with no evidence of leakage. Many building departments require a longer hold, commonly 24 hours in trade practice, and the local department's requirement governs. The test is inspected before tile covers the liner. If the test shows a leak, the liner is repaired and tested again before tile goes on.

The rest of the room. The bathroom floor outside the shower also needs to shed water. If a floor drain is provided, the floor slope must not exceed 1:48, so water runs to the drain without making the floor itself a slope to walk on. Keep the vanity and toilet bases sealed at the floor, and keep water from standing around the toilet base or under the vanity, where it rots the floor unseen. Ask to see the flood test water in the shower pan before tile starts, and ask for the inspection sign-off. It is the one moment in the job when the waterproofing can still be seen and checked.

6. Condo and HOA approval

A condo accessible bathroom remodel needs two separate approvals: the association's approval under the building's own rules, and a city building permit for any plumbing, electrical, mechanical or structural work. Neither replaces the other, and the HB 803 exemption does not apply to condos at all.

The association's clock is the building's, not the state's. Florida's Condominium Act (Chapter 718) sets no statewide form or procedure for approving interior unit renovations. How long board approval takes, what packet it requires, and whether it wants the city permit first or second are all set by the building's declaration, bylaws and rules. No published figure for board approval time was found, because there is no standard to publish. Get the building's architectural-review packet before signing a contract, and ask the board how long its review takes.

What some cities require on top of the association's process (verified on official city pages, and carried over from our condo guide):

  • Hollywood: a permit application for a residential property or condominium must include an association approval letter and an Affidavit of Awareness of the homeowners association for the scope of work.
  • Aventura: permit applications require a homeowners association, property-manager or condominium authorization letter.
  • Sunny Isles Beach: condo permits require a signed and notarized letter from the condominium association stating it is aware work will be performed and naming the company approved to do it. All remodeling permits in condominium buildings must go through Miami-Dade County DERM and Fire before being submitted to the city.
  • Hallandale Beach: the city's permit applications page lists an "HOA Affidavit" form among its permit forms. Its exact contents were not opened and are unverified.

Working rules. Working hours, elevator bookings, water shut-off scheduling and flooring rules are set by the building, not by the state, and no official page sets them. They decide the crew's working day and how many days a phase takes. Get them in writing before work starts.

Milestone inspections and reserve studies can change the timing. For residential condo buildings 3 or more stories high, Florida law requires a milestone inspection by December 31 of the year the building reaches 30 years of age (25 years if the local enforcement agency requires it), and every 10 years after. Phase 1 must be completed within 180 days, the inspector's summary must go to every unit owner within 45 days, and if Phase 2 finds substantial structural deterioration, repairs must be commenced within 365 days. A structural integrity reserve study is required at least every 10 years, and associations existing on or before July 1, 2022 had to complete the first study by December 31, 2025, and in no event later than December 31, 2026. No state law bans interior work during a milestone inspection or reserve-study repair program, but a building in the middle of one may restrict concurrent work under its own rules, and a special assessment levied mid-project changes what a client can spend. Ask whether one is planned before you sign.

A unit owner shall not do anything that would adversely affect the safety or soundness of the common elements (s. 718.113(3), Florida Statutes). Moving a drain, opening a floor or widening a door can touch common elements, so the association's approval covers whether that work may go ahead.

The full condo position is in our condo renovation guide.

7. What it costs

The ranges below are Genesis planning ranges for Broward and Palm Beach counties. They are planning ranges, not quotes. Scope, materials and permits move any job within its range. Miami-Dade jobs are quoted individually at the consultation, because the price table covers Broward and Palm Beach counties only.

  • Full accessible bathroom: $8,000 to $16,000.
  • Aging-in-place walk-in shower conversion: $3,600 to $9,600.
  • Grab bars and accessibility package: $400 to $3,200 (per bar $120 to $320).
  • Walk-in tub install: $3,200 to $17,700 (typical $4,000 to $8,000).
  • Standard full bathroom remodel: $7,200 to $22,400 (typical $9,600 to $16,000).
  • Primary / master suite bathroom: $12,000 to $40,000.
  • Tub-to-shower conversion: $2,800 to $8,000.
  • Wheelchair ramp: $900 to $4,000 typical; custom up to $8,000+.
  • Stair lift: straight $2,000 to $4,000; curved $6,400 to $12,000+.

What moves a job within its range: the size of the room, whether the drain or the door opening moves, curb or curbless, the tile and fixtures chosen, whether the walls are opened for blocking, permit fees, and the building's requirements for a condo. No separate figure is published for any of those items. The written quote is the only price that applies to a home.

The walk-in tub, ramp and stair lift ranges are national figures: no South Florida-specific source for them was found when the price table was prepared, so treat them as the least certain ranges on this list.

The $1,500 credit. "Credit applies to signed contracts of $20,000 or more when the consultation was booked online and the contract is signed within 3 calendar days of the consultation. Limit 3 per month. Cannot be combined with other offers." A full accessible bathroom on its own ($8,000 to $16,000) is below the $20,000 contract threshold, so the credit does not apply to it alone. It can apply when the bathroom is part of a larger signed contract of $20,000 or more, for example a master suite bathroom or two rooms together.

Flexible financing available — ask us.

If you need help paying for the work, read our guide to ways to pay at ways to pay. It covers VA grants for veterans, Florida and county programs, and other options. It does not repeat the program details here. Confirm eligibility and current terms with the agency listed before you rely on any program.

8. What delays the job

  • Materials ordered late. Tile, fixtures, a walk-in tub and glass can all take time to arrive, and glass is measured after the tile is set, so its lead time starts after tiling. Order before demolition, and have as much material on site as possible before the old room comes out.
  • Changes made midstream. The National Kitchen and Bath Association calls changes during construction the leading cause of budget overruns, and they cost time the same way: reordering, rework, and in some cases a revised permit or a new inspection. Decide the layout, materials and fixtures before demolition.
  • An incomplete permit application. The 5-day completeness notice and the 10-day revision and re-review cycle in s. 553.792 are the state's answer to incomplete applications, and each cycle adds days. A complete application, with signed and sealed plans where required, is the fastest way through review.
  • A failed inspection. Correct the work, call for a re-inspection, and wait for the next slot. The schedule should leave room for at least one correction cycle rather than assuming every inspection passes first time. A failed flood test means repairing the liner and testing again before tile.
  • Condo and HOA rules. Working hours, elevator bookings, water shut-off scheduling and flooring rules are set by the building, not by the state, and no official page sets them. They decide the crew's working day and how many days a phase takes. Get them in writing before work starts.
  • What demolition uncovers. Old plumbing, hidden water damage, a drain that cannot move where planned, or a load-bearing wall where the plans showed none. None of it is visible until the walls are open. A schedule that assumes a clean demolition has no room for it.
  • Weather. Heavy rain and storm season can pause work and delay deliveries. Exterior work and deliveries are the parts most affected; interior work usually continues.

The best protection against all of these is the same: decide everything before demolition, order materials early, file a complete permit application, and keep a written schedule with room for one correction cycle.

9. What to do next

If you are planning an accessible bathroom remodel in Broward, Miami-Dade or Palm Beach County, request a free in-home design consultation. We will walk through your bathroom with you, measure the room and the door, confirm the permit position for your address, confirm the condo or association rules if your home is a condo, and give you a written quote with a schedule for your job. Book the consultation online to keep the $1,500 credit available if the job grows into a signed contract of $20,000 or more. The permit detail is in our permit guide, the condo detail is in our condo renovation guide, the full picture of how long a remodel takes is in our remodel timeline, and the shower conversion itself is in our tub-to-shower conversion guide.

Sources

What we could not verify

  • Remodel duration: no published duration for an accessible bathroom remodel alone was found on an official source. The NKBA master bath figures in section 2 are the closest published guide.
  • Glass lead time: glass is measured after the tile is set, but no published figure for the fabrication and installation time was verified from an official source.
  • 2023 Florida Plumbing Code text of s. 421.4.2: the 22 inch shower entry figure was not read directly on codes.iccsafe.org for this draft. It was verified against the 2018 International Plumbing Code text and against Florida sources citing the same section.
  • 2023 Florida Building Code, Residential text of s. R307.2: the 6 foot non-absorbent wall surface figure was not read directly on codes.iccsafe.org for this draft. It was verified against the International Residential Code text and Florida sources citing the same section.
  • 2023 Florida Building Code, Residential text of s. P2709.2 and P2709.3: the shower lining materials and installation text was not read directly. The lining figures stated in section 5 come from the Florida Building Commission's 2004 course material quoting the same section numbers. P2709.1 and P2709.4 were read directly in the 2023 edition.
  • Lining jamb extension: the 2004 material states the lining extends not less than 3 inches beyond or around rough jambs, while 2023 sources state 2 inches. The figure conflicts, so it is not stated in this guide.
  • Flood test hold time: the model code minimum is 15 minutes with at least 2 inches of water at the threshold. Whether a local building department requires a longer hold, commonly 24 hours in trade practice, was not verified for any city we serve, and the 2023 Florida Plumbing Code text of s. 312.9 was not read directly.
  • 9th Edition (2026) Florida Building Code text: the Code text cited in this guide is the 2023 Florida Building Code, Eighth Edition. The 9th Edition takes effect December 31, 2026, and its text was not verified. A claim seen only on a contractor page, that the 9th Edition adds a permit exemption for accessibility renovations, was not verified from an official source and is not stated in this guide.
  • Permit review times for most cities: no published review time for a kitchen or bathroom remodel was found on the official pages of Hallandale Beach, Hollywood, Aventura, Boca Raton, Pembroke Pines, Miami-Dade County, Broward County or Palm Beach County. Third-party estimates for those cities exist and conflict with each other, so they are not used. Only the state deadlines in s. 553.792 and the City of Fort Lauderdale's published 30-day figure are stated.
  • Inspection scheduling time: no official figure was found for how long an inspection takes to schedule once requested in any of the cities we serve.
  • Condo board approval time: no published figure exists, because Chapter 718 sets no statewide procedure and each building sets its own review time.
  • Hallandale Beach forms: the city's "HOA Affidavit" form is listed on its applications page, but its contents were not opened and are unverified.
  • Florida Building Code accessibility provisions: no Florida Building Code accessibility provision was verified from an official source for this draft. All accessibility figures are the ADA Standards reference dimensions from the U.S. Access Board and the 2010 ADA Standards text, and a private home does not have to meet them.
  • Walk-in tub, ramp and stair lift ranges: the price table states no South Florida-specific source was found for these three ranges; they are national figures, so they are the least certain ranges in section 7.
  • Miami-Dade prices: the price table covers Broward and Palm Beach counties only. No Miami-Dade price range is stated in this guide. Miami-Dade jobs are quoted individually at the consultation.

Get my free estimate

Call NowFree Quote