Tub-to-Shower Conversion in South Florida

Genesis Home Design LLC is a Florida Certified General Contractor, Lic. #CGC1542493, based in Hallandale Beach, FL, serving Broward, Miami-Dade and Palm Beach counties.

Bathroom after a tub-to-shower conversion: tiled walk-in shower with sliding glass doors

Licensed & Insured: Florida Certified General Contractor (Lic. #CGC1542493) Free in-home design consultation We call within minutes during business hours Written workmanship warranty

Start here

Free In-Home Design Consultation

Step 1 of 3

Free In-Home Design Consultation · No obligation

What are you remodeling?

Or call (754) 714-5024

Licensed & Insured · FL Lic. #CGC1542493

What happens next
  1. We call you within minutes (business hours)
  2. Free In-Home Design Consultation & measure
  3. Written fixed-price quote
  4. We build, permits handled

A tub-to-shower conversion removes the bathtub and builds a shower in the space where the tub stood. The shower usually fills the same footprint, though the layout can change if the room allows it. It is the most common bathroom change for a household that showers every day and rarely or never uses the tub, and it is also the standard first step when stepping over a high tub wall becomes hard or unsafe. A conversion is not a cosmetic swap. It moves plumbing, opens walls and floors, and rebuilds the waterproofing from the drain up, so it needs a permit, inspections and a tested shower pan. This guide walks through what the job is, the phases in order, the permit and condo rules, the accessibility dimensions that matter, the waterproofing and drainage, the cost ranges, and what delays the job. It is general information, not legal advice. If a question involves your contract or your rights, talk with a Florida attorney before you sign.

1. What it is and who it suits

A conversion takes out the tub, its surround and its fixtures, and puts in a shower floor, a drain, walls, a valve and a shower head. The shower may have a low curb, a very low threshold, or no curb at all, which is called curbless. It may have a door, a fixed glass panel, or an open entry with no door.

A conversion is built in one of two ways: a factory-made shower unit with its own pan, or a site-built shower with a lined pan and tiled walls. The Code minimums for size, drainage and waterproofing apply to both.

It suits a household that showers and never bathes, a person who finds the tub wall hard to step over, anyone planning to age in place, and anyone who wants a larger or more open shower, or a shower that works while seated. The National Institute on Aging advises replacing a tub with a walk-in or curbless shower if stepping over the tub wall is no longer safe.

Think twice if the home has one bathroom and small children who bathe in a tub, or if the tub is the only tub in the house. Losing the only tub is a decision to make with the whole household, not a detail to settle after demolition starts.

The vanity, the toilet and the floor outside the shower stay as they are unless the quote includes them. If the whole bathroom is rebuilt around the new shower, that is a full bathroom remodel, and the standard full remodel range in section 7 applies instead.

2. The conversion in order

A conversion runs in the same order every time, and the order is not a preference. The building official has to see the pipes and the waterproofing before anything covers them. Glass cannot be measured until the tile is set, because the opening is not final until the tile is in.

Design and selections. Goals, measurements, layout, materials and fixtures are decided here. The shower must meet the Code minimums for size: at least 900 square inches of floor and at least 30 inches in its smallest dimension, with a clear entry of at least 22 inches (Florida Building Code, Residential, s. P2708.1; Florida Building Code, Plumbing, s. 421.4.2). Hinged shower doors open outward. This is also when the curb or curbless entry, the door or open entry, the valve and shower head positions, the tile, and the blocking for grab bars and a seat are decided. Section 4 gives the accessibility dimensions to plan around.

Permits. The permit application goes to the city, or the county for an unincorporated address, with the plans and trade details. No plumbing or electrical work may start before the permit is issued. Section 3 gives the permit rules.

Demolition. The tub comes out, and the wall surfaces in the wet area come out to the studs. Demolition is usually the fastest phase. What it uncovers can change the schedule: hidden damage, old plumbing that does not meet the current Code, or a wall that turns out to be load-bearing. None of that can be priced or timed until the walls are open, which is why a schedule made before demolition is an estimate, not a promise.

Rough-in. The drain moves to the new shower position, and new supply lines, a valve and a shower head go in. Any electrical work, such as a moved outlet or light, goes in here too, as does any framing change for a wider opening or a seat. In a home built on a concrete slab, moving the drain usually means opening the floor. Rough-in must be inspected before the walls are closed. See section 3.

Waterproofing and the flood test. The liner and waterproofing go in, and the lined pan is filled with water and checked for leaks before any tile covers it. Section 5 gives the details.

Finishes. Tile, fixtures, glass and paint go in, in that order. Tile goes on after the waterproofing passes, on a backer approved for wet areas. Fixtures go in last.

Final inspection and walkthrough. The final inspections are made after the building is complete and ready for occupancy. The walkthrough is where the homeowner and the contractor go through the finished shower together and list anything still to fix, the punch list. The job is done when the punch list is done and the final inspection has passed.

How long it takes. No official source states how long a tub-to-shower conversion takes on its own. The closest published guide is the National Kitchen and Bath Association rule of thumb for the complete rebuild of a master bath (120 square feet): four months to plan and two months to execute. A conversion is smaller than a full rebuild, but its calendar still depends on the permit review, material delivery and inspection scheduling. Do not take any figure in this guide as a promise for your home. The written quote for your job is the only schedule that applies to it.

3. Permits and inspections

A tub-to-shower conversion needs a permit. It moves plumbing fixtures and drains and changes the shower, so it is plumbing work, and plumbing work needs a permit.

The HB 803 small-job exemption does not help. It applies only if all six of its conditions are true, including that the work involves no electrical, plumbing, structural, mechanical or gas work at all. A conversion always involves plumbing work, so it cannot qualify. The full six conditions are in our permit guide.

The position by city and county, verified on official pages and carried over from our permit guide:

  • Aventura expressly names kitchen remodel and bathroom remodel as permit work.
  • Fort Lauderdale: a remodel touching plumbing, electrical, mechanical, gas or structure still requires a permit regardless of cost.
  • Palm Beach County (unincorporated): replacing a bathtub or shower needs a permit even like-for-like, and HB 803 does not apply in Palm Beach County at all, because the whole county is designated a flood hazard area.
  • Miami-Dade County: a permit is needed for interior renovations that alter or repair electrical or plumbing. Like-for-like fixture replacement is exempt only where no valves, pipes or fixtures are replaced or rearranged, and a conversion replaces and rearranges them.

State deadlines. Florida law sets deadlines for permit decisions in s. 553.792, Florida Statutes. After receiving a complete and sufficient application, the local government must approve, approve with conditions, or deny the permit within:

  • 5 business days, for a complete application on an existing single-family home where the work is valued under $15,000.
  • 30 business days, for a residential unit, including a single-family home, in a structure under 7,500 square feet.
  • 60 business days, for a residential unit in a structure of 7,500 square feet or more, and for multifamily residential buildings up to 50 units.

These deadlines run from a complete application. The city must tell the applicant in writing within 5 business days what is needed to deem the application complete, or the application is automatically deemed complete and accepted. If the city asks for revisions, the applicant has 10 business days to submit them, and the city then has 10 business days to approve or deny. If the city misses a deadline, it must reduce the permit fee by 10 percent for each business day it is late, or 20 percent per business day if it misses the 10-day re-review deadline. A local ordinance may set a shorter deadline than the statute.

One city figure. The City of Fort Lauderdale states on its Permitting Services page that it generally attempts to review permit applications within 30 working days, and that its Development Services Department is committed to complete all initial permit reviews within 30 days or less of receipt. That matches the 30-business-day state deadline for a single-family home under 7,500 square feet.

No published review time was found for the other cities we serve. Hallandale Beach, Hollywood, Aventura, Boca Raton, Pembroke Pines, Miami-Dade County, Broward County and Palm Beach County publish their permit processes, but no published review time for a kitchen or bathroom remodel was found on their official pages. Third-party estimates for those cities exist and conflict with each other, so they are not used here. Confirm the current review time with the building department for your address before planning around a date.

Permit expiry. A permit for a single-family home now expires 1 year after issuance, or on the effective date of the next edition of the Florida Building Code, whichever is later. An extension is still possible. A permit that expires before the work is done must be renewed, which adds time, so the construction schedule should fit inside the permit's life.

Inspections. The Florida Building Code, Chapter 1, s. 110.3, lists the required inspections, and the building official determines their timing and sequence. For a conversion, the plumbing rough-in inspection comes after the framing is in place and all soil, waste and vent piping is complete, and before the wall or ceiling membranes are installed. An electrical rough-in inspection follows the same rule if the job moves or adds any electrical work. Final inspections for each trade come after the building is complete, all fixtures are in place and properly connected, and the structure is ready for occupancy.

Two rules in the Code shape the schedule. First, the rough-in inspections happen before the walls are closed, so drywall, tile and finishes wait on them. Second, work must not be covered before the required inspection is completed and approved. Covering work early can require removing it at the owner's expense for re-inspection. A failed inspection means correcting the work and calling for a re-inspection, which adds days. No published figure was found for how long an inspection takes to schedule once requested in any of the cities we serve. The lined pan is also tested and inspected before tile covers it, as described in section 5.

4. Accessibility and safety

A note on measurements. The 2010 ADA Standards for Accessible Design set rules for places of public accommodation and government facilities, not for a private home. The measurements in this section come from those Standards, as explained in the U.S. Access Board's guide to bathing rooms, and are used here as a reference for sizing a shower, grab bars, a seat and controls. They are not legal requirements for your home. Where no official source states a figure, this guide describes the check without inventing a number.

The bathroom is where the most serious falls at home happen, because it combines hard, wet surfaces with sitting down and standing up. The U.S. Department of Veterans Affairs notes that about half of all falls happen at home. The National Institute on Aging advises replacing a tub with a walk-in or curbless shower if stepping over the tub wall is no longer safe. A conversion is the right time to build in the safety features, because the walls are open and the drain, the valve and the controls are all being placed anyway.

Shower types, in reference dimensions. The Access Board guide describes three shower types. The figures are reference dimensions for a home, not Code requirements.

  • Transfer shower: 36 by 36 inches clear inside. That figure is exact, not a minimum. The entry is at least 36 inches wide. The clear floor space in front is 36 inches wide by 48 inches long minimum, measured from the control wall, and it extends 12 inches minimum beyond the seat wall. A seat is required, folding or non-folding. In a dwelling unit, a seat is not required if the walls are properly reinforced so a seat can be installed later.
  • Standard roll-in shower: at least 30 inches deep by 60 inches wide, with the entry running the full 60 inch width. The clearance is 30 by 60 inches. Grab bars go on three walls where there is no seat. The controls sit above the grab bars, no higher than 48 inches, and at least 1 1/2 inches above the grab bar. The threshold is up to 1/2 inch if beveled. The shower floor slope is 1:48 maximum.
  • Roll-in shower with a folding seat: the seat sits on a side wall and extends to within 3 inches of the entry. The controls sit on the back wall, no more than 27 inches from the seat wall. The seat height is 17 to 19 inches.
  • Alternate roll-in shower: the entry is at least 36 inches wide at one end. The controls sit on the side wall farther from the entry. Grab bars go on the back wall and on the side wall farther from the entry.

Thresholds. For a transfer shower, the threshold is 1/2 inch maximum. In alterations, 2 inches maximum is permitted where a 1/2 inch threshold would disturb structural reinforcement of the floor slab. A curbless shower removes the step entirely: the floor slopes to the drain and there is no curb to step over. The 1/2 inch figure is the reference to plan around for a low entry.

Grab bars. The top of the gripping surface is 33 to 36 inches above the finished floor. A round bar is 1 1/4 to 2 inches in diameter, sits 1 1/2 inches from the wall, and holds 250 pounds applied at any point. Nothing may project within 12 inches above a grab bar, or within 1 1/2 inches of its bottom and ends. In a private home, grab bars are not required if the walls are properly reinforced for later installation. The practical takeaway is to put solid blocking in the walls during the conversion, at the shower and at the toilet, so grab bars can be fitted later without opening the wall. Build in a hand-held spray and controls within reach of a seated person too, even if you do not need them today. The conversion is the only time the walls are open.

Seat. The seat height is 17 to 19 inches. The seat extends to within 3 inches of the entry and withstands 250 pounds. A folding seat keeps the shower usable standing or seated.

Controls. For a transfer shower, the controls sit on the side wall, 38 to 48 inches above the floor, and 15 inches maximum from the seat centerline. Controls must be operable with one hand, with no tight grasping, pinching or twisting, and with no more than 5 pounds of force. Choose a control that can be worked with one hand without gripping tightly or twisting.

Hand-held spray. The shower needs a hand-held spray unit that can also be used in a fixed position. The hose is at least 59 inches long. The water temperature is limited to 120 degrees F, and the spray must be reachable within 48 inches above the shower floor. Set the water heater to 120 degrees F to avoid scalding tap water.

Slip resistance. Put nonskid strips or mats on the shower floor and on the bathroom floor where it may get wet. The shower floor slope in section 5 also matters: water must run to the drain, not pool where you stand.

5. Waterproofing and drainage

The shower is the wettest place in the house, and the waterproofing is hidden behind tile. It is the part of the job that matters most and is hardest to fix later.

Size minimums. A shower compartment must have at least 900 square inches of interior floor area and at least 30 inches in its smallest dimension, measured from the finished interior dimension, exclusive of fixture valves, shower heads, soap dishes and safety grab bars. The shower must hold that size to a height of at least 70 inches above the drain outlet. Two exceptions apply: a fold-down seat is permitted if the 900 square inches is maintained when the seat is folded up, and a 25 inch minimum dimension is permitted if the area is at least 1,300 square inches. The clear entry is at least 22 inches wide, and hinged shower doors open outward. (Florida Building Code, Residential, s. P2708.1; Florida Building Code, Plumbing, s. 421.4.2.)

Walls. Bathtub and shower floors and walls above bathtubs with installed shower heads, and shower compartments, must be finished with a non-absorbent surface. The wall surface must extend to a height of at least 6 feet (72 inches) above the floor. Joints must be water-tight. (Florida Building Code, Residential, s. R307.2 and s. P2708.1.)

Curb. The curb is 2 to 9 inches deep, measured from the top of the curb to the top of the drain, and it must sit at least 1 inch below the sides and back of the receptor. For a curbless shower there is no curb; the floor slopes to the drain and the threshold reference is 1/2 inch maximum, as described in section 4. (Florida Building Code, Residential, s. P2709.1.)

Floor slope. The finished shower floor slopes uniformly toward the drain at 2 to 4 percent (1/4 to 1/2 unit in 12). The ADA reference for a roll-in shower caps the slope at 1:48, which sits inside the Code range. (Florida Building Code, Residential, s. P2709.1; U.S. Access Board guide, s. 608.2.2.)

Drain. The shower drain is flanged, so it makes a water-tight joint with the lining. A clamping ring makes the water-tight connection between the lining and the drain, and the drain has weep holes into it. The drain sits at the low point of the floor, and moving it to the right place is part of the rough-in in section 2. (Florida Building Code, Residential, s. P2709.4.)

Liner. For a site-built shower floor, the lining is pitched 2 percent toward the drain, turns up at least 2 inches above the finished threshold, and is not nailed or perforated at any point less than 1 inch above the finished threshold. (Florida Building Code, Plumbing, s. 417.5.2, as quoted in the Florida Building Commission course material.)

Flood test. Before any tile or mortar covers the liner, the drain is plugged watertight and the lined area is filled with water to at least 2 inches at the threshold. The model code requires the water to be held at least 15 minutes with no evidence of leakage. Many building departments require a longer hold, commonly 24 hours in trade practice, and the local department's requirement governs. The test is inspected before tile covers the liner. If the test shows a leak, the liner is repaired and tested again before tile goes on. (International Plumbing Code, s. 312.9, as adopted in the Florida Plumbing Code.)

Ask to see the flood test water in the pan before tile starts, and ask for the inspection sign-off. It is the one moment in the job when the waterproofing can still be seen and checked.

6. Condo and HOA approval

A condo tub-to-shower conversion needs two separate approvals: the association's approval under the building's own rules, and a city building permit for any plumbing, electrical, mechanical or structural work. Neither replaces the other, and the HB 803 exemption does not apply to condos at all.

The association's clock is the building's, not the state's. Florida's Condominium Act (Chapter 718) sets no statewide form or procedure for approving interior unit renovations. How long board approval takes, what packet it requires, and whether it wants the city permit first or second are all set by the building's declaration, bylaws and rules. No published figure for board approval time was found, because there is no standard to publish. Get the building's architectural-review packet before signing a contract, and ask the board how long its review takes.

What some cities require on top of the association's process (verified on official city pages, and carried over from our condo guide):

  • Hollywood: a permit application for a residential property or condominium must include an association approval letter and an Affidavit of Awareness of the homeowners association for the scope of work.
  • Aventura: permit applications require a homeowners association, property-manager or condominium authorization letter.
  • Sunny Isles Beach: condo permits require a signed and notarized letter from the condominium association stating it is aware work will be performed and naming the company approved to do it. All remodeling permits in condominium buildings must go through Miami-Dade County DERM and Fire before being submitted to the city.
  • Hallandale Beach: the city's permit applications page lists an "HOA Affidavit" form among its permit forms. Its exact contents were not opened and are unverified.

Working rules. Working hours, elevator bookings, water shut-off scheduling and flooring rules are set by the building, not by the state, and no official page sets them. They decide the crew's working day and how many days a phase takes. Get them in writing before work starts.

Milestone inspections and reserve studies can change the timing. For residential condo buildings 3 or more stories high, Florida law requires a milestone inspection by December 31 of the year the building reaches 30 years of age (25 years if the local enforcement agency requires it), and every 10 years after. Phase 1 must be completed within 180 days, the inspector's summary must go to every unit owner within 45 days, and if Phase 2 finds substantial structural deterioration, repairs must be commenced within 365 days. A structural integrity reserve study is required at least every 10 years, and associations existing on or before July 1, 2022 had to complete the first study by December 31, 2025, and in no event later than December 31, 2026. No state law bans interior work during a milestone inspection or reserve-study repair program, but a building in the middle of one may restrict concurrent work under its own rules, and a special assessment levied mid-project changes what a client can spend. Ask whether one is planned before you sign.

A unit owner shall not do anything that would adversely affect the safety or soundness of the common elements (s. 718.113(3), Florida Statutes). Moving a drain or opening a floor can touch common elements, so the association's approval covers whether that work may go ahead.

The full condo position is in our condo renovation guide.

7. What it costs

The ranges below are Genesis planning ranges for Broward and Palm Beach counties. They are planning ranges, not quotes. Scope, materials and permits move any job within its range. Miami-Dade jobs are quoted individually at the consultation, because the price table covers Broward and Palm Beach counties only.

  • Tub-to-shower conversion: $2,800 to $8,000.
  • Aging-in-place walk-in shower conversion: $3,600 to $9,600.
  • Grab bars and accessibility package: $400 to $3,200 (per bar $120 to $320).
  • Full accessible bathroom: $8,000 to $16,000.
  • Standard full bathroom remodel: $7,200 to $22,400 (typical $9,600 to $16,000). Use this range when the conversion grows into a rebuild of the whole bathroom.

What moves a job within its range: the size of the shower, curb or curbless, the tile and fixtures chosen, how far the drain moves, whether the walls are opened for blocking or a seat, permit fees, and the building's requirements for a condo. No separate figure is published for any of those items. The written quote is the only price that applies to a home.

The $1,500 credit. "Credit applies to signed contracts of $20,000 or more when the consultation was booked online and the contract is signed within 3 calendar days of the consultation. Limit 3 per month. Cannot be combined with other offers." A conversion on its own ($2,800 to $8,000) is below the $20,000 contract threshold, so the credit does not apply to a conversion alone. It can apply when the conversion is part of a larger signed contract of $20,000 or more.

Flexible financing available — ask us.

If you need help paying for the work, read our guide to ways to pay at ways to pay. It covers VA grants for veterans, Florida and county programs, and other options. It does not repeat the program details here. Confirm eligibility and current terms with the agency listed before you rely on any program.

8. What delays the job

  • Materials ordered late. Tile, fixtures and glass can all take time to arrive, and glass is measured after the tile is set, so its lead time starts after tiling. Order before demolition, and have as much material on site as possible before the old room comes out.
  • Changes made midstream. The National Kitchen and Bath Association calls changes during construction the leading cause of budget overruns, and they cost time the same way: reordering, rework, and in some cases a revised permit or a new inspection. Decide the layout, materials and fixtures before demolition.
  • An incomplete permit application. The 5-day completeness notice and the 10-day revision and re-review cycle in s. 553.792 are the state's answer to incomplete applications, and each cycle adds days. A complete application, with signed and sealed plans where required, is the fastest way through review.
  • A failed inspection. Correct the work, call for a re-inspection, and wait for the next slot. The schedule should leave room for at least one correction cycle rather than assuming every inspection passes first time. A failed flood test means repairing the liner and testing again before tile.
  • Condo and HOA rules. Working hours, elevator bookings, water shut-off scheduling and flooring rules are set by the building, not by the state, and no official page sets them. They decide the crew's working day and how many days a phase takes. Get them in writing before work starts.
  • What demolition uncovers. Old plumbing, hidden water damage, a drain that cannot move where planned, or a load-bearing wall where the plans showed none. None of it is visible until the walls are open. A schedule that assumes a clean demolition has no room for it.
  • Weather. Heavy rain and storm season can pause work and delay deliveries. Exterior work and deliveries are the parts most affected; interior work usually continues.

The best protection against all of these is the same: decide everything before demolition, order materials early, file a complete permit application, and keep a written schedule with room for one correction cycle.

9. What to do next

If you are planning a tub-to-shower conversion in Broward, Miami-Dade or Palm Beach County, request a free in-home design consultation. We will walk through your bathroom with you, confirm the permit position for your address, confirm the condo or association rules if your home is a condo, and give you a written quote with a schedule for your job. Book the consultation online to keep the $1,500 credit available if the job grows into a signed contract of $20,000 or more. The permit detail is in our permit guide, the condo detail is in our condo renovation guide, and the full picture of how long a remodel takes is in our remodel timeline.

Sources

What we could not verify

  • Conversion duration: no published duration for a tub-to-shower conversion alone was found on an official source. Contractor marketing pages give conflicting figures (1 to 2 days for acrylic kits; 1 to 3 weeks for tiled conversions; 7 to 14 days; 2 to 3 weeks), so none are used. The NKBA master bath figures in section 2 are the closest published guide.
  • Glass lead time: glass is measured after the tile is set, but no published figure for the fabrication and installation time was verified from an official source.
  • 2023 Florida Plumbing Code text of s. 421.4.2: the 22 inch shower entry figure was not read directly on codes.iccsafe.org for this draft. It was verified against the 2018 International Plumbing Code text and against Florida sources citing the same section.
  • 2023 Florida Building Code, Residential text of s. R307.2: the 6 foot non-absorbent wall surface figure was not read directly on codes.iccsafe.org for this draft. It was verified against the International Residential Code text and Florida sources citing the same section.
  • 2023 Florida Building Code, Residential text of s. P2709.2 and P2709.3: the shower lining materials and installation text was not read directly. The lining figures stated in section 5 come from the Florida Building Commission's 2004 course material quoting the same section numbers. P2709.1 and P2709.4 were read directly in the 2023 edition.
  • Lining jamb extension: the 2004 material states the lining extends not less than 3 inches beyond or around rough jambs, while 2023 sources state 2 inches. The figure conflicts, so it is not stated in this guide.
  • Flood test hold time: the model code minimum is 15 minutes with at least 2 inches of water at the threshold. Whether a local building department requires a longer hold, commonly 24 hours in trade practice, was not verified for any city we serve, and the 2023 Florida Plumbing Code text of s. 312.9 was not read directly.
  • 9th Edition (2026) Florida Building Code text: the Code text cited in this guide is the 2023 Florida Building Code, Eighth Edition. The 9th Edition takes effect December 31, 2026, and its text was not verified. A claim seen only on a contractor page, that the 9th Edition adds a permit exemption for accessibility renovations, was not verified from an official source and is not stated in this guide.
  • Permit review times for most cities: no published review time for a kitchen or bathroom remodel was found on the official pages of Hallandale Beach, Hollywood, Aventura, Boca Raton, Pembroke Pines, Miami-Dade County, Broward County or Palm Beach County. Third-party estimates for those cities exist and conflict with each other, so they are not used. Only the state deadlines in s. 553.792 and the City of Fort Lauderdale's published 30-day figure are stated.
  • Inspection scheduling time: no official figure was found for how long an inspection takes to schedule once requested in any of the cities we serve.
  • Condo board approval time: no published figure exists, because Chapter 718 sets no statewide procedure and each building sets its own review time.
  • Hallandale Beach forms: the city's "HOA Affidavit" form is listed on its applications page, but its contents were not opened and are unverified.
  • Florida Building Code accessibility provisions: no Florida Building Code accessibility provision was verified from an official source for this draft. All accessibility figures are the ADA Standards reference dimensions from the U.S. Access Board, and a private home does not have to meet them.
  • Miami-Dade prices: the price table covers Broward and Palm Beach counties only. No Miami-Dade price range is stated in this guide. Miami-Dade jobs are quoted individually at the consultation.

Get my free estimate

Call NowFree Quote